A short check of operation.
Government guidance for offices and shops commonly describes monthly function checks. Some routine checks can be carried out by a suitably instructed person on site.
Emergency lighting · Birmingham
Arrange planned testing, investigate failed emergency lights and agree the repairs your premises need. Clear findings and practical next steps for offices, shops, hospitality venues and managed properties.
Testing with a purpose
Start with the system information and test records you already have. BES agrees the inspection and testing scope, required duration, access and records before the visit.
Testing is planned around the people using the building, including the effects of battery discharge, recharge time and any temporary arrangements.
Discuss your premisesGovernment guidance for offices and shops commonly describes monthly function checks. Some routine checks can be carried out by a suitably instructed person on site.
The same guidance describes annual full-discharge testing. BES reviews the system specification and premises requirements rather than assuming every test has the same duration.
The fire risk assessment, system and manufacturer’s instructions inform the arrangements. Read the Home Office guidance
Faults & corrective work
A battery, fitting, circuit or control fault can need a different solution. BES investigates the agreed issue and explains the corrective work before you authorise it.
Review failed tests, fault indicators, damaged fittings or reported loss of operation. Existing reports help define the investigation.
Review suitable repairs or replacements, access requirements and the price. A failed test does not automatically mean replacing the whole fitting.
The agreed work, results, limitations and further recommendations form the handover. Unresolved items need appropriate follow-up.
Your quotation identifies what is included. Additional corrective work proceeds only after authorisation.
Send the fault detailsFor property & facilities teams
Build testing and defect follow-up into an agreed maintenance programme. Keep the responsibilities, visit windows and records clear for each site.
Discuss a maintenance planSite postcodes, approximate fitting quantities, system information and existing reports.
Plan access and test windows, and clarify which routine checks remain with your site team.
Review findings and separately quoted repairs, with future attendance agreed around the portfolio.
Commercial experience
BES’s commercial project experience includes restaurant emergency-lighting fault investigation and electrical work in offices, retail and hospitality environments.
Tell us about trading hours, restricted areas and access at height so these can be considered before the visit.
For one building or several premises, send the location, existing information and what needs attention.
Explore BES project experience Read general BES customer reviewsUseful answers
The building, system and existing information shape the work. These answers help you prepare an enquiry.
Technical requirements are reviewed for the agreed scope. The current UK code of practice is BS 5266-1:2025 .
Government guidance for offices and shops commonly describes monthly function checks and an annual full-discharge test. The appropriate testing arrangements depend on your premises, fire risk assessment, system specification, manufacturer's instructions and existing records. BES agrees the scope and safe test window before the visit.
Some routine function checks can be carried out by a suitably instructed person on site. The system and the person's competence determine what is appropriate. BES can discuss support for annual testing, record review, faults and separately agreed maintenance.
The required full duration is checked against the system specification and premises requirements before testing. A universal three-hour assumption is not used. Access, the effects of discharge, recharge time and any temporary arrangements must also be agreed.
Self-testing can reduce routine manual checks, but results, faults, records and maintenance still need appropriate review. Tell BES what equipment you have and share any available system instructions or reports.
The quotation identifies the agreed inspection, testing or investigation scope. Any corrective work is explained and separately authorised before it proceeds. A failed test does not automatically establish that the whole fitting needs replacing.
An inspection or test record describes the agreed scope, findings and limitations. It does not replace the premises' fire risk assessment or guarantee the compliance of the whole building. Defects and further recommendations need appropriate follow-up.
Yes. Agree safe access, the effect of a test, recharge and recovery time and any temporary arrangements before starting. Evening, weekend or phased attendance can be discussed for occupied premises.
Yes. Send the site locations, approximate fitting quantities, existing reports and preferred timing. BES can discuss a coordinated testing and maintenance proposal, with access, responsibilities and corrective work agreed for each site.
Your next step
Request testing, discuss a failed emergency light or ask about maintenance for your sites. BES reviews the details and confirms the appropriate next step.
Send your job details using the form. BES will review the request and reply using the contact details you provide.
A submitted enquiry is not a confirmed booking or an assurance that the system is safe. BES agrees the scope, price and attendance before work proceeds.
Connected commercial services
Discuss related inspection, maintenance or lighting work as a separate agreed scope for the premises.